The purpose of the heave/settlement points is to measure vertical movements in foundation soils during, and subsequent to, construction. The heave/settlement point consists of a three-prong anchor, a ¼" standard inner pipe, and a 1" standard outer pipe. The pipes are assembled in sections and fastened together with standard couplings to the required anchor depths.